EasyManua.ls Logo

Acteon X-MIND prime 3D ceph - Page 75

Acteon X-MIND prime 3D ceph
376 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual Installation
SERVICE MANUAL • X-MIND prime 3D • (19) • 11/2019 • NXMPEN080A
73
6.
If necessary, mark the holes for fixing the base to the floor.
7.
Move back the packaging, drill the wall and, if necessary, the floor, put the
dowels, reposition the packaging against the wall and secure the wall bracket
and the base plate with the screws.
Mark the holes on the floor

Table of Contents

Related product manuals