EasyManua.ls Logo

BENSHAW RSi H2 Series - Page 246

BENSHAW RSi H2 Series
397 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PID Control
234
890053-00-02
PID Operation Sleep Mode Setting Details
Code
Description
AP1-05
Sleep Bst Set
Sets the sleep boost amount before entering Sleep Mode. Feedback
must reach the boost level (PID Reference+Sleep Bst Set) above the
setpoint before entering Sleep Mode.
AP1-06
Sleep Bst Freq
Sets the inverter operating frequency to reach sleep boost level.
AP1-07
PID Sleep1 DT
AP1-08
PID Sleep1Freq
If the operating frequency stays below the sleep mode frequency (AP1-
08) for the set time (AP1-07), the inverter accelerates to the PID sleep
boost frequency (AP1-06). Then, when the feedback reaches the boost
amount (AP1-05) above the setpoint, the inverter enters sleep mode.
AP1-09
PID WakeUp1 DT
AP1-10
PID WakeUp1Dev
Set the Wake Up delay time and Wake Up deviation amount. When the
PID feedback amount falls below the setpoint by the deviation amount
(AP1-10) for the delay time (AP1-09), the inverter wakes up and
resumes PID operation.
IN-65~71
P1P7 Define
When a digital input is set to ’39 Sleep Wake Chg and activated, PID
Sleep/Wake Up is operated based on the parameter settings at AP1-
11~14.
AP1-11
PID Sleep2 DT
AP1-12
PID Sleep2Freq
AP1-13
PID WakeUp2 DT
AP1-14
PID WakeUp2Dev
Sleep/Wake Up 2 settings (AP1-11 ~ AP1-14) operate the same as
Sleep/Wake Up 1 (AP1-07 ~ AP1-10).
Note
PID Wakeup level may be calculated using the following formula:
PID Wakeup Level = PID-04 (PID Ref Value)AP1-10 (PID WakeUp1Dev).
Or if using Sleep/Wake Up 2, PID-04 (PID Ref Value) - AP1-14 PID (WakeUp2Dev).

Table of Contents

Related product manuals