Preparing the Installation
890053-00-02
1.4 Selecting and Preparing a Site for Installation
When selecting an installation location consider the following points:
The inverter must be installed on a wall that can support the inverter’s weight.
The location must be free from vibration. Vibration can adversely affect the operation of the inverter.
The inverter can become very hot during operation. Install the inverter on a surface that is fire-resistant or
flame-retardant and with sufficient clearance around the inverter to allow air to circulate. The illustrations
below detail the required installation clearances.