EasyManua.ls Logo

BENSHAW RSi H2 Series - Page 248

BENSHAW RSi H2 Series
397 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PID Control
236
890053-00-02
Code
Description
AP1-24
Fill Step Set
Set the amount of each Soft Fill step. After Pre-PID operation time, if
feedback amount has not reached the Soft Fill Set (exit) amount (AP1-23),
Soft Fill operation begins. The PI Reference (setpoint) will automatically
change to this "Soft Fill PI Reference" (AP1-24) amount and start the Soft Fill
operation. The "Soft Fill PI Reference" becomes the new PI Ref (setpoint).
Soft Fill steps are based on AP1-24 and AP1-25.
AP1-25
Fill Step Time
Set the time for each Soft Fill step. This is the time of each Soft Fill PI Ref
step (AP1-24). The steps will increase by AP1-24 amount when the feedback
reaches the Fill Feedback Difference (AP1-26). If the feedback remains
below the Soft Fill PI Ref., the inverter does not increase to the next step.
AP1-26
Fill Fdb Diff
Set a difference amount to increase to the next Soft Fill step. This amount is
the difference between the Soft Fill PI Reference (AP1-24) amount and the
feedback amount. When the feedback increases to the AP1-26 amount
below the step amount (whichever step it is on), the inverter increases the
Soft Fill PI Ref. to the next step. If the feedback remains below the AP1-26
amount, the Soft Fill PI Ref. does not increase to the next step.
After Pre-PID and Soft Fill operation, normal PI Control begins. The PID Reference value (setpoint)
becomes the PID-11, PID Ref1 Set value.

Table of Contents

Related product manuals