20. Remove the three shift cable bracket retaining
bolts (1).
(Tighten: Shift cable bracket retaining bolts to
25 ± 5 N·m)
21. Remove the three exhaust manifold heat shield
bolts (1) and then remove heat shield.
(Tighten: Exhaust manifold heat shield bolts to
20 ± 5 N·m)
22. Disconnect the upstream and downstream oxygen sensor connectors.
23. Remove the three catalytic converter to exhaust
manifold bolts (1).
(Tighten: Catalytic converter to exhaust manifold
bolts to 60 ± 5 N·m)
24. Remove the front axle shaft (See Front Axle Shaft Removal & Installation in Section 09 Driveline & Axle).
25. Drain the steering oil.
ON-VEHICLE SERVICE
VISM080025
PZSM020024
PZSM020008
02–36
Chery Automobile Co., Ltd.