EasyManuals Logo

Chery A1 2009 User Manual

Chery A1 2009
1080 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
20. Remove the three shift cable bracket retaining
bolts (1).
(Tighten: Shift cable bracket retaining bolts to
25 ± 5 N·m)
21. Remove the three exhaust manifold heat shield
bolts (1) and then remove heat shield.
(Tighten: Exhaust manifold heat shield bolts to
20 ± 5 N·m)
22. Disconnect the upstream and downstream oxygen sensor connectors.
23. Remove the three catalytic converter to exhaust
manifold bolts (1).
(Tighten: Catalytic converter to exhaust manifold
bolts to 60 ± 5 N·m)
24. Remove the front axle shaft (See Front Axle Shaft Removal & Installation in Section 09 Driveline & Axle).
25. Drain the steering oil.
ON-VEHICLE SERVICE
VISM080025
PZSM020024
PZSM020008
02–36
Chery Automobile Co., Ltd.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Chery A1 2009 and is the answer not in the manual?

Chery A1 2009 Specifications

General IconGeneral
BrandChery
ModelA1 2009
CategoryAutomobile
LanguageEnglish

Related product manuals