EasyManua.ls Logo

Fujitsu PRIMERGY RX2520 M5

Fujitsu PRIMERGY RX2520 M5
508 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 9: Locking the cable clamp of a PSU
Pull the cable clamp up (1).
Thread the power cord through the cable clamp (2).
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.7 Switching on the server
CAUTION
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
For more information, see "Important information" on page 29
.
Press the On/Off button to start up the server
.
Ensure that the power-on indicator is lit green.
Basic hardware procedures
RX2520 M5 Upgrade and Maintenance Manual 57

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2520 M5

Related product manuals