Operation
183
Pos: 32.12 /BA/Bedienun g /Großpackenpresse/ Ballenausschi eberAusschieben des let zten Ballens T2 HS Baureihe @ 92\ mod_1326816067774 _78.docx @ 782640 @ 3 @ 1
10.6.2 Activating the bale ejector
The bale ejector depends on the variant (Medium / Comfort electronics).
10.6.2.1 Medium electronics design:
Fig. 118
The operating control device is located on the rear left side of the machine on the yoke.
The bale ejector (1) is activated by the rear control lever (3) in the Medium electronics design.
To do this:
• Activate the control unit (red4)
• Open shut-off valves (4) and (5)
• Tighten the safety sleeve (2) and move the control lever (3) to position (a) or (b)
Position (a): The bale ejector (1) moves forward.
Position (b): The bale ejector (1) moves back.
Note
After the bale is ejected, it is essential to move the bale ejector to the forward position again. To
do this, move the control lever (3) to position (a) as described above. Finally, close the shut-off
valves (4, 5).
10.6.3 Comfort electronics design:
In the Comfort electronics design, this function can be performed with the operator terminal (see
chapter on KRONE ISOBUS terminal "Function Keys") or on the keys (see chapter on KRONE
ISOBUS terminal "Keys on the Machine").
Pos: 32.13 /BA/--- ------------ Seitenumbruch------ ---------- @ 0\mod_119617 5311226_0.doc x @ 4165 @ @ 1