Issue 9 October 1998
10-1
Lucent Technologies
10
Operational Tests
Overview
This section provides instructions to test protection switching and the
nontransmission cabling. This section is not intended to replace acceptance test
procedures. If problems are encountered, refer to the "Troubleshooting" section of
this manual. For detailed troubleshooting, refer to the 363-206-202 (Releases 6
and 7), 363-206-280 (Releases 8, 9 and 11) or 363-206-285 (Release 13)
DDM-2000 OC-3 Multiplexer User/Service Manual
.
Test Equipment
The following equipment is required:
NOTE
:
All precautions should be observed when handling fiber.
!
WARNING:
Unterminated optical connectors may emit laser radiation. Do not view
beam with optical instruments.
Quantity Description
1 Wrist strap connected to the electrostatic discharge (ESD)
jack on the user panel for ESD protection
1
ASCII Terminal or PC configured as a terminal