EasyManua.ls Logo

Mitsubishi GOT1000 Series - Preparatory Procedures for Monitoring

Mitsubishi GOT1000 Series
1216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 - 6
6.2 Preparatory Procedures for Monitoring
6.2.2 Checking OS installation on GOT
6.2.2 Checking OS installation on GOT
Check if the OS is properly installed or not on the Drive information tab of GT Designer2.
For the operation on the Drive information tab, refer to the following manual.
GT Designer2 Version Basic Operation/Data Transfer Manual
The OS has been installed successfully on the GOT
if the following can be confirmed:
1) Standard monitor OS
2) Communication driver: CC-Link (ID)

Table of Contents

Related product manuals