EasyManua.ls Logo

Mitsubishi GOT1000 Series - Checking for Normal Monitoring

Mitsubishi GOT1000 Series
1216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.2 Preparatory Procedures for Monitoring
6.2.7 Checking for normal monitoring
6 - 17
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION
TO CPU
4
COMPUTER LINK
CONNECTION
5
MELSECNET/10
CONNECTION (PLC TO
PLC NETWORK)
6
CC-Link CONNECTION
(INTELLIGENT DEVICE
STATION)
7
CC-Link CONNECTION
(Via G4)
8
ETHERNET
CONNECTION
3 Confirming the PLC side setting
When connecting the GOT, setting is required for the PLC side.
Confirm if the PLC side setting is correct.
Section 6.3 PLC Side Setting

Table of Contents

Related product manuals