6.3  PLC Side Setting
6.3.1  Connecting to CC-Link module (Q Series)
6 - 21
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION 
TO CPU
4
COMPUTER LINK 
CONNECTION
5
MELSECNET/10 
CONNECTION (PLC TO 
PLC NETWORK)
6
CC-Link CONNECTION 
(INTELLIGENT DEVICE 
STATION)
7
CC-Link CONNECTION 
(Via G4)
8
ETHERNET 
CONNECTION
2 Switch setting of CC-Link module (Q Series)
Set the station number setting switch, transmission speed / mode setting switch.
(1) Station number setting switch
: Necessary  : As necessary  : Not necessary
(2) Transmission rate/mode setting switch
: Necessary  : As necessary  : Not necessary
*1 Specify the same transmission speed as that of GOT.
When the switch setting has been changed
Turn the PLC CPU OFF then ON again, or reset the PLC CPU.
Station number setting switch Description Setting Setting necessity at GOT connection
Station number setting 
(master station)
0 (fixed)
Transmission rate/mode setting 
switch
Description Setting
Setting necessity at GOT connection
Transmission rate/mode 
setting
(Online: 156kbps) 
*1
0
(1)
(2)
QJ61BT11, QJ61BT11N
0
5
0
5
0
8
1
2
7
6
5
4
3
STATION 
NO.
X10
X1
MODE
QJ61BT11N
RUN
ERR. 
SD 
MST
L RUN
L ERR.
RD
S MST
NC
DA
DB
NC
SLD
DG
(FG)
C
4
0
5
0
5
STATION 
NO.
X10
X1
0
8
MODE
C
4