EasyManua.ls Logo

Mitsubishi GOT1000 Series - Page 259

Mitsubishi GOT1000 Series
1216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3 PLC Side Setting
6.3.1 Connecting to CC-Link module (Q Series)
6 - 23
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION
TO CPU
4
COMPUTER LINK
CONNECTION
5
MELSECNET/10
CONNECTION (PLC TO
PLC NETWORK)
6
CC-Link CONNECTION
(INTELLIGENT DEVICE
STATION)
7
CC-Link CONNECTION
(Via G4)
8
ETHERNET
CONNECTION
(2) Station information setting
: Necessary : As necessary : Not necessary
*1 When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 2 mode)], [Remote station points] is
available to set.
[Remote station points] is a setting for the remote I/O station.
The default value (32 points) must be used on the GOT.
*2 When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 2 mode)] or [Remote net - Additional mode],
set to [Ver. 1 Intelligent device station].
*3 Set the same number of occupied stations as that on the GOT.
When changing the network parameter
After writing the network parameter to the PLC CPU, operate the PLC CPU ether
turning OFF and then ON or resetting.
Item
*1
Setting
Setting necessity at GOT
connection
Station type
*2
Intelligent device station (fixed)
Exclusive station count
*3
Exclusive station 1
Reserve/invalid station select No setting
Intelligent buffer select (word) (Use default value.)

Table of Contents

Related product manuals