9 - 1
9
9
CONNECTION TO 
OMRON PLC
10
CONNECTION TO 
KEYENCE PLC
11
CONNECTION TO 
SHARP PLC
12
CONNECTION TO 
TOSHIBA PLC
13
CONNECTION TO 
HITACHI PLC
14
CONNECTION TO 
MATSUSHITA PLC 
15
CONNECTION TO 
YASKAWA PLC 
16
CONNECTION TO 
YOKOGAWA PLC
CONNECTION TO 
OMRON PLC
9.1 System Configuration  . . . . . . . . . . page 9-2
This section describes the equipment and cables needed 
when connecting a GOT to an OMRON PLC.
Select a system suitable for your application.
9.2 Connection Cable . . . . . . . . . . . . page 9-17
This section describes the specifications of the cables 
needed when connecting to an OMRON PLC.
Check the specifications of the connection cables.
9.3 Preparatory Procedures for Monitoring
 . . . . . . . . . . . . . . . . . . . . . . . . . . page 9-23
This section provides the procedures to be followed before 
performing monitoring in connection to an OMRON PLC.
This procedures are written on the step-by-step basis so 
that even a novice GOT user can follow them to start 
communications.
9.4 PLC Side Setting . . . . . . . . . . . . . page 9-37
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.