12.3  Preparatory Procedures for Monitoring
12.3.1  Installing OS onto GOT
12 - 13
9
CONNECTION TO 
OMRON PLC
10
CONNECTION TO 
KEYENCE PLC
11
CONNECTION TO 
SHARP PLC
12
CONNECTION TO 
TOSHIBA PLC
13
CONNECTION TO 
HITACHI PLC
14
CONNECTION TO 
MATSUSHITA PLC 
15
CONNECTION TO 
YASKAWA PLC 
16
CONNECTION TO 
YOKOGAWA PLC
12.3.1 Installing OS onto GOT
Install the standard monitor OS, communication driver and option OS onto the GOT.
For the OS installation methods, refer to the following manual.
 GT Designer2 Version   Basic Operation/Data Transfer Manual
1 Check-mark a desired standard monitor OS, communication driver, option OS, and extended function 
OS, and click the   button.
Check the following under the Communication driver.
 • TOSHIBA PROSEC T/V
Install