13.3  Preparatory Procedures for Monitoring
13.3.2  Checking OS installation on GOT
13 - 13
9
CONNECTION TO 
OMRON PLC
10
CONNECTION TO 
KEYENCE PLC
11
CONNECTION TO 
SHARP PLC
12
CONNECTION TO 
TOSHIBA PLC
13
CONNECTION TO 
HIATACHI PLC
14
CONNECTION TO 
MATSUSHITA PLC 
15
CONNECTION TO 
YASKAWA PLC 
16
CONNECTION TO 
YOKOGAWA PLC
13.3.2 Checking OS installation on GOT
Check if the OS is properly installed or not on the Drive information tab of GT Designer2.
For the operation on the Drive information tab, refer to the following manual.
 GT Designer2 Version   Basic Operation/Data Transfer Manual
The OS had been installed successfully on the GOT 
if the following can be confirmed:
1) Standard monitor OS
2) Communication driver (either of the following): 
· HITACHI HIDIC H 
· HITACHI HIDIC H (Protocol2)