2.2  Preparatory Procedures for Monitoring
2.2.6  Verifying GOT recognizes connected equipment
2 - 41
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION 
TO CPU
4
COMPUTER LINK 
CONNECTION
5
MELSECNET/10 
CONNECTION (PLC TO 
PLC NETWORK)
6
CC-Link CONNECTION 
(INTELLIGENT DEVICE 
STATION)
7
CC-Link CONNECTION 
(Via G4)
8
ETHERNET 
CONNECTION
When changing communication interface setting by Utility
The communication interface setting can be changed by the Utility.
For details on the Utility, refer to the following manual.
 GT   User's Manual
Section 2.4
Communication 
Check Sheet
When you have verified in the Communication setting that the GOT recognizes the 
connected equipment, mark the check sheet.
 Unit selection (Communication module)
Check