24.3 Preparatory Procedures for Monitoring
24.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Comfirming the servo amplifier side setting
This section explains the GOT side setting.
When confirming the servo amplifier side setting, refer to the following.
Section 24.4 Setting on Servo Amplifier Side
Install the OS onto the GOT.
Section 24.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 24.3.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 24.3.3
Setting communication interface
(Communication settings)
Download the project data.
Section 24.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 24.3.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 24.3.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 24.3.7
Checking for normal monitoring