EasyManua.ls Logo

Monarch nice3000 - Page 282

Monarch nice3000
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NICE3000
new
User Manual 9 Troubleshooting
- 281 -
9
Fault
Code
Name Possible Causes Solution
Level
Err51
CAN
communication
abnormal
Subcode 101: Feedback data
of CANbus communication
with the CTB remains
incorrect.
1. Handling at inspection-speed
commissioning:
This fault does not affect inspection-speed
commissioning and you can hide the fault
directly on the operation panel.
2. Handling at normal-speed commissioning
and running:
Subcode 101:
Check the communication cable
connection.
Check the power supply of the CTB.
Check whether the 24 V power supply of
the controller is normal.
Check whether there is strong-power
interference on communication.
1A
Err52
HCB
communication
abnormal
Subcode 101: Feedback data
of Modbus communication with
the HCB remains incorrect.
1. Handling at inspection-speed
commissioning:
This fault does not affect inspection-speed
commissioning and you can hide the fault
directly on the operation panel.
2. Handling at normal-speed commissioning
and running:
Subcode 101:
Check the communication cable
connection.
Check whether the 24 V power supply of
the controller is normal.
Check whether the HCB addresses are
repeated.
Check whether there is strong-power
interference on communication.
1A

Table of Contents

Related product manuals