Data Center Room Checklist Items Yes No N/A Comment
Are you providing any additional
hardware?
Is the hardware you are providing fully
compatible with the Exalogic machine?
Will the new hardware location require
any non-standard cable lengths?
Is the floor to ceiling height a minimum
of 2914 mm or 2.9 m (9.6 feet)?
Is the depth of the raised floor a
minimum of 46 cm (18 inches)?
B.3 Data Center Environment Checklist
Complete the following checklist to ensure that the data center environment
requirements are met. For information about environment requirements, see
Temperature and Humidity Requirements.
Data Center Environment
Considerations
Yes No N/A comment
Does the computer room air handling
meet temperature and humidity
requirements?
Does the installation floor layout satisfy
the ventilation requirements?
Will the equipment be positioned so the
exhaust air of one rack does not enter
the air intake of another rack?
Are the perforated floor tiles each rated
at 400 CFM or greater?
Do the data center air conditioners
provide sufficient front to back airflow?
Is airflow adequate to prevent hot
spots?
Can the data center continuously
satisfy environmental requirements?
Can more vented floor tiles be obtained
if required?
B.4 Access Route Checklist
Complete the following checklist to ensure that the access route requirements are met.
Data Center Environment Checklist
Site Checklists B-3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle Exalogic Elastic Cloud and is the answer not in the manual?

Oracle Exalogic Elastic Cloud Specifications

General IconGeneral
BrandOracle
ModelExalogic Elastic Cloud
CategoryServer
LanguageEnglish

Related product manuals