Caution:
Carefully unpack the rack from the packaging and shipping pallet. Rocking or
tilting the rack can cause it to fall over and cause serious injury or death. You
should always use professional movers when unpacking and installing this
rack.
Note:
After unpacking the rack from the packaging, save the mounting brackets
used to secure the rack to the shipping pallet. You can use these mounting
brackets to secure the rack permanently to the installation site floor. Do not
dispose of these brackets, as you will not be able to order replacement
brackets.
Figure 3-1 Unpacking Exalogic Machine Rack
3.2.4 Tools for Installation
The following tools are required for installation:
• Screwdriver handle (magnetic)
• T-30 Torx wrench key
• T-25 Torx wrench key
Prepare to Install an Exalogic Machine
3-4 Oracle Exalogic Elastic Cloud Machine Owner's Guide