7
7.13
9925723 R01 - 2015 RZR 900 Service Manual
© Copyright 2014 Polaris Industries Inc.
6. 50″ ONLY Remove the fasteners
retaining the rear
stabilizer bar to the upper control arm.
7. Remove the fasteners
retaining the upper control
arm to the bearing carrier.
8. Rotate the bearing carrier down while pushing in on
the half shaft.
CAUTION
Be careful not to pinch or stretch the brake line. Use
rope or wire to secure the bearing carrier.
9. With a quick, short jerk outward, remove the half shaft
from the transmission.
Rear Half Shaft Installation
1. If the half shaft is not being replaced, install a new
spring ring
on the half shaft. Apply anti-seize to the
splines
.
2. Align splines of the half shaft with transmission
splines and reinstall the half shaft by pushing in with a
quick jerk.
3. Install the half shaft through the carrier bearing and
rotate the bearing carrier upward. Install fasteners
and torque to specification.
Bearing Carrier Mounting Fasteners:
42 ft-lb (57 Nm)
FINAL DRIVE