3.72
9925723 R01 - 2015 RZR 900 Service Manual
© Copyright 2014 Polaris Industries Inc.
27. Reinstall the oil cooler
, if previously removed. Use
new O-rings upon installation
.
28. Torque oil cooler retaining bolts to specification.
Oil Cooler Retaining Bolts:
7 ft-lb (10 Nm)
29. Proceed to Flywheel Installation, page 3.72 and
then Cylinder Head Installation, page 3.76.
Flywheel Installation
1. If previously removed, reinstall the flywheel key.
2. Clean taper of crankshaft to remove all oil or grease.
3. Clean flywheel taper to remove all oil or grease.
4. Align flywheel key-way with key and install the
flywheel, seating it fully on taper.
5. Install flywheel retaining bolt. Using a commercially
available strap wrench, hold the flywheel and torque
the flywheel retaining bolt
to specification.
NOTE: If the Cylinder Holding & Camshaft
Timing Plate (PU-50563) is installed, remove it
before tightening the flywheel.
Flywheel Retaining Bolt:
133 ft-lbs (180 Nm)
6. Install the starter torque limit gear as an assembly.
ENGINE / COOLING SYSTEM