Chapter 15: Maintaining Your Library
Maintenance Actions
634 Quantum Scalar i6000 User’s Guide
• If the graphical report shows a failed result for the I/E station, make
sure the I/E station and front door are completely shut.
• If running the test again still generates failed results, realign the
middle X-axis rail and check the alignment of the top and bottom X-
axis rails at the location of the failure.
See Figure 70 on page 634.
Figure 70 Vertical Alignments
Graphical Report