(2) To verify Tube Transfer operation
1) Transfer the tube of the specified tube rack in the following order.
incubation well
Æ reagent dispense Æ detector well Æ discard
2) DO NOT leave reaction tubes on the Reaction Tube Rack to prevent malfunction.
[
n], [p] keys: Use to move cursor.
[+] key: Use to increase value on which cursor is positioned.
[-] key: Use to decrease value on which cursor is positioned.
[Set] key: Press to perform the tube transfer test.
[Return] key: Press to quit the test and to return to Test Menu display.
(3) To cancel tube transfer test operation
Press [Cancel] key to stop the operation, then the tube transfer test setting screen will appear.
5.5.6 Catcher Test
Verify the catcher operation.
(1) Press [Special Operate]
Æ [Service] Æ [Test Menu] Æ [Catcher Test] keys to start, then the following
screen will be displayed.
Return
Tube No. = 5
Detect No. = 1
Warm No. = 1
0 / 0
Set
Test Stop
RESET
Ready
Replace Rack? YES!
Sysmex
IP
Catcher Test
Figure 5-5-7: Catcher Test Screen
(2) To verify catcher operation
Set reaction tubes in the “1”, “5”, “21”, “25”, “31”, “35”, “56” and “60” position of the Reaction Tube Rack.
DO NOT place tubes in the other positions.
[RESET] key: Use to clear the test cycle counts.
[Set] key: Press to perform the catcher test.
[Return] key: Press to quit the test and to return to Test Menu display.
(3) To cancel catcher test operation
Press [Cancel] key to stop the operation, then the catcher test setting screen will appear.
CA-500 Series S/M 5-13 Revised December 2001 8