EasyManua.ls Logo

TomTec QUADRA 4 - Nitrogen Dry

TomTec QUADRA 4
217 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Quadra 4 Operator Manual
Tomtec
69
3.19 Nitrogen Dry
The Nitrogen Dry operation provides a means to blow nitrogen gas out the tips to
expedite sample drying.
Conditions
A 450µL backfill pump with the optional nitrogen gas valve installed is required.
Remarks
Seconds
indicates the amount of time for nitrogen gas to be blown out the tips.
Height
indicates the desired stage position to perform the operation.

Table of Contents