EasyManua.ls Logo

Universal Robots UR16e

Universal Robots UR16e
373 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection action type Timeframe
Monthly Biannually Annually
3 Check
robot cable
V
4 Check
robot cable
connection
V
V = Visual inspection
* = Must also be checked after heavy collision
Robot Arm Visual Inspection
NOTICE
Using compressed air to clean the robot arm can damage the robot arm
components.
Never use compressed air to clean the robot arm.
1. Move the robot arm to the Zero position, if possible.
2. Turn off the robot and disconnect the power cable from the Control Box.
3. Inspect the cable between the Control Box and robot arm for any damage.
4. Check the base mounting bolts are properly tightenend.
5. Inspect the flat rings for wear and damage.
Replace the flat rings if they are worn or damaged.
6. Inspect the blue lids on all the joints for any cracks or damage.
Replace the blue lids if they are cracked or damaged.
7. Inspect the screws used to secure the blue lids.
UR16e 60 User Manual
2.Part I Hardware Installation Manual
Copyright © 2009–2024 by UniversalRobotsA/S. All rights reserved.

Table of Contents

Other manuals for Universal Robots UR16e

Related product manuals