7.6 Direct controlled injection valve
7.6.1 Direct controlled injection valve - remove
Periodicity
Description
Working hours 24 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.5 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic 1
Support equipment
Description Part No. CSN QTY
Hexagon head bolt 94270C 2
Stud bolt 94270D 2
Brass wire brush N/A 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
CAUTION
Danger of injury to personnel! Use applicable equipment to lift and move the injection
valve, or do the work with two persons.
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
• The HP fuel pipes must be removed, refer to section 13.3.2 HP fuel pipe (fuel rail to
injection valve) - remove
X62DF
AA00-2722-00AAA-520A-A
Maintenance Manual Direct controlled injection valve - remove
Winterthur Gas & Diesel Ltd.
- 258 - Issue 002 2020-10