10.3.4 Fuel pump - install
Periodicity
Description
Working hours 20 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Support equipment
Description Part No. CSN QTY
Cover 94552 pc 1
Supplies
Description QTY
Oil A/R
Molykote paste G A/R
Penetrating oil, for example WD-40 A/R
Spare Parts
Description Part No. CSN QTY
Fuel pump A/R
O-rings 3
SAFETY PRECAUTIONS
WARNING
Injury Hazard: Before you operate the turning gear, make sure that no personnel are near
the flywheel, or in the engine.
PRELIMINARY OPERATIONS
• None
X72DF
AA00-5556-00AAA-720A-A
Maintenance Manual Fuel pump - install
Winterthur Gas & Diesel Ltd.
- 568 - Issue 002 2020-10