Fig 7-26 Compensator - install
29 Do a leakage check of the pipe (001, Figure 7-24).
30 Do a pressure test of the opening pressure.
CLOSE UP
• None
X72DF
AA00-2140-00AAA-720A-A
Maintenance Manual Gas admission valve - install
Winterthur Gas & Diesel Ltd.
- 223 - Issue 002 2020-10