9.1.2 Gear wheel crankshaft - do a check of the teeth backlash
Periodicity
Description
Working hours 7000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Intermediate AR
Support equipment
Description Part No. CSN QTY
Feeler gauge 94122 1
Micrometer N/A 1
Dial gauge N/A 1
Supplies
Description QTY
Wire 1.5 mm A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-4106-00AAA-360A-A
Maintenance Manual Gear wheel crankshaft - do a check of the teeth backlash
Winterthur Gas & Diesel Ltd.
- 512 - Issue 002 2020-10