Fig 11-27 Water separator - view 7
4 Put the water separator (003, Figure 11-27) with the spur-geared chain block (001) in
front of the opening.
5 Make sure that the water separator (003) is in the correct position.
6 Put the chain (004) into the lifting tool on the rear side of the water separator (003).
7 Operate the lever chain hoist (005) until the lifting tool (002) is near the opening.
X72DF
AA00-6708-00AAA-720A-A
Maintenance Manual Water separator - install
Winterthur Gas & Diesel Ltd.
- 666 - Issue 002 2020-10