EasyManua.ls Logo

WinGD X62DF - Fuel Pump - Do a Test of the Operation

Default Icon
897 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.3.5 Fuel pump - do a test of the operation
Periodicity
Description
Working hours 6000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 0.5 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Intermediate 1
Support equipment
Description Part No. CSN QTY
Heat gun N/A 1
Small drill bit N/A 1
Nylon brush N/A 1
Supplies
Description QTY
WD-40 A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
WARNING
Injury Hazard. Do not operate the engine. Injury to personnel can occur.
WARNING
Injury Hazard. Before you operate the turning gear, make sure that no personnel are near
the flywheel, or in the engine.
PRELIMINARY OPERATIONS
The fuel pump must be installed, refer to section 10.3.4 Fuel pump - install
The engine must be stopped.
X62DF
AA00-5556-00AAA-320A-A
Maintenance Manual Fuel pump - do a test of the operation
Winterthur Gas & Diesel Ltd.
- 572 - Issue 002 2020-10

Table of Contents

Related product manuals