7.6.5 Direct controlled injection valve - install
Periodicity
Description
Working hours 24 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Stud bolt 94270D 2
Supplies
Description QTY
White spirit A/R
Never-Seez NSBT A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
CAUTION
Injury Hazard: When you do work with white spirit, always put on gloves and safety
goggles that have a closed side frame. White spirit can cause damage to your skin and
eyes.
PRELIMINARY OPERATIONS
• None
X72DF
AA00-2722-00AAA-720A-A
Maintenance Manual Direct controlled injection valve - install
Winterthur Gas & Diesel Ltd.
- 270 - Issue 002 2020-10