8.7.5 Piston (removed) - do checks of the surface and clearances
Periodicity
Description
Working hours 36 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 0.5 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Template 94366 1
Feeler gauge 94122 1
Calliper gauge N/A 1
Inside micrometer set 94101 1
Supplies
Description QTY
Emery cloth A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The piston must be removed, refer to section 8.7.3 Piston - remove
• The piston rings must be removed, refer to section 8.8.1 Piston ring - remove
X62DF
AA00-3403-00AAA-360B-A
Maintenance Manual Piston (removed) - do checks of the surface and clearances
Winterthur Gas & Diesel Ltd.
- 490 - Issue 002 2020-10