11.2.2 Auxiliary blower - install
Periodicity
Description
Working hours 30 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.5 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Spur-geared chain block 94017-2.5-6-5 2
Spur-geared chain block 94017-2.5-5-4 3
Shackle (WLL 8500 kg) 94019L 2
Shackle (WLL 6500 kg) 94019K 1
Shackle (WLL 3250 kg) 94019H 3
Slings (WLL 2000 kg) 94039-013 2
Trolley 94015F 1
Lifting tool 94651 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
Electric motor 1
Electric motor 1
SAFETY PRECAUTIONS
WARNING
Injury Hazard. Use only applicable equipment to lift and move the electric motor.
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-6545-00AAA-720A-A
Maintenance Manual Auxiliary blower - install
Winterthur Gas & Diesel Ltd.
- 640 - Issue 002 2020-10