EasyManuals Logo

WinGD X62DF User Manual

Default Icon
902 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #640 background imageLoading...
Page #640 background image
11.2.2 Auxiliary blower - install
Periodicity
Description
Working hours 30 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.5 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Spur-geared chain block 94017-2.5-6-5 2
Spur-geared chain block 94017-2.5-5-4 3
Shackle (WLL 8500 kg) 94019L 2
Shackle (WLL 6500 kg) 94019K 1
Shackle (WLL 3250 kg) 94019H 3
Slings (WLL 2000 kg) 94039-013 2
Trolley 94015F 1
Lifting tool 94651 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
Electric motor 1
Electric motor 1
SAFETY PRECAUTIONS
WARNING
Injury Hazard. Use only applicable equipment to lift and move the electric motor.
PRELIMINARY OPERATIONS
The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-6545-00AAA-720A-A
Maintenance Manual Auxiliary blower - install
Winterthur Gas & Diesel Ltd.
- 640 - Issue 002 2020-10

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WinGD X62DF and is the answer not in the manual?

WinGD X62DF Specifications

General IconGeneral
BrandWinGD
ModelX62DF
CategoryEngine
LanguageEnglish

Related product manuals