8.7.2 Piston - prepare before removal
Periodicity
Description
Working hours 36 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Support equipment
Description Part No. CSN QTY
Lifting tool 94209 1
Distance holder 94230 2
Piston suspension device 94341 1
Plate 94341A 2
Supplies
Description QTY
Oil A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
WARNING
Injury Hazard: Before you operate the turning gear, make sure that no personnel are near
the flywheel, or inside the engine.
PRELIMINARY OPERATIONS
• The cylinder cover must be removed, refer to section 7.5.1 Cylinder cover - remove
• The engine temperature must be cool.
X72DF
AA00-3403-00AAA-523A-A
Maintenance Manual Piston - prepare before removal
Winterthur Gas & Diesel Ltd.
- 476 - Issue 002 2020-10