PROCEDURE
1 Attach an applicable rope to hold the toggle lever up to prevent damage.
2 Attach the deviation pipe (006, Figure 8-19) to the column.
3 Operate the lever chain hoists (001, 003) to move the connecting rod (002) to the
position shown in view A.
4 Attach the shackle (005) to the cylinder block.
5 Attach the spur-geared schain block (004) to the shackle (005) and the lifting tool on the
connecting rod (002).
6 Operate the chain block (004) to hold the weight of the connecting rod (002).
7 Remove the lever chain hoists (001, 003).
8 Operate the turning gear and the chain block (004) to move the connecting rod (002)
counterclockwise to the position shown in view B.
9 Continue to operate the turning gear and the chain block (004) until the connecting rod
(002) goes through the column door (view C).
10 Attach the shackles (009) to the top platform.
11 Attach the applicable chain (008) to the two shackles (009).
12 Attach the chain block (007) to the chain (008) and the top end of the lifting tool.
13 Operate the chain block (007) to hold the weight of the connecting rod (002).
14 Remove the chain block (004).
X72DF
AA00-3303-00AAA-520A-A
Maintenance Manual Connecting rod - remove
Winterthur Gas & Diesel Ltd.
- 384 - Issue 002 2020-10