EasyManua.ls Logo

WinGD X62DF - Page 467

Default Icon
897 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTE: During this step, make sure that the elastic bolts in the connecting rod align
with the holes in the crosshead pin.
44 Remove the two lever chain hoists (011).
45 Use an applicable tool and sufficient personnel to remove the two lifting tools (007, 014)
from the connecting rod (008).
X62DF
AA00-3326-00AAA-720A-A
Maintenance Manual Crosshead - install
Winterthur Gas & Diesel Ltd.
- 467 - Issue 002 2020-10

Table of Contents

Related product manuals