The parameters in the table above show the frequency command sources for the keypad and the
operation command sources for the Time Event.
The following is an example of an inverter operation utilizing the Time Period modules 1 and 2
with Time Events 1 and 2:
Time Period 1 is used to operate the inverter on Mondays and Tuesdays from 10AM to 8PM. Time
Period 2 is used to operate the inverter on Tuesday from 12PM to 5PM.
Time Event 1 triggers forward operations based on the frequency input on the keypad and
continues the operation for the time set at Time Period module 1. Time Event 2 operates the
inverter at Speed-L for the time set at Time Period module 2.