EasyManua.ls Logo

Emerson Rosemount Xstream Series - Power-On and Measuring Screen

Emerson Rosemount Xstream Series
298 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
X-STREAM
5-11
Instruction Manual
HASAxE-IM-HS
05/2006
Emerson Process Management GmbH & Co. OHG
5 User Interface
5-4 Menu System - Power-On and Measuring Screen
5-4-1 Power-On and Measuring Screen
After connecting the instrument to power a
power-on-self-test (POST) is started showing
copyright and software revision
followed by
remaining time till operation mode
(count down; here: 10 seconds left)
Finally the MEASURING SCREEN shows up.
(Here:
CO2.1: CO
2
is channel 1
O2.2: O
2
is channel 2
Temp-1: temperature sensor 1 value
(Messages): Messages, if available)
This screen is operator configurable:
5-4-3-1 Display Setup Menu, page 5-18.
Pressing any key, except the HOME key, while
in measuring screen opens the main menu. The
entries herein open submenus, described in
the following sections:
Setup menu 5-4-3, page 5-20
Status menu
5-4-4, page 5-47
Info menu 5-4-5, page 5-55
Control Menu
5-4-2, page 5-13
Emerson Process
Management
(c) 2005
Revision: 0.06 05
CO2.1 135.1 ppm
O2.2 201952 ppm
Temp-1 58.8 °C
(Messages)
Warm-Up
Time: 10 s
Control…
Setup…
Status…
Info…
MEASURING SCREEN
MAIN MENU

Table of Contents

Other manuals for Emerson Rosemount Xstream Series

Related product manuals