X-STREAM
Emerson Process Management GmbH & Co. OHG 6-1
Instruction Manual
HASAxE-IM-HS
05/2006
6 Initial Startup
Chapter 6
Initial Startup
After unpacking and installing the instrument
it's always a good choice to check the
instrument's setup and configure it to the
operator's needs before performing any other
actions:
What hardware is installed?
Is it setup to meet your needs (alarms
setup, in/outputs, etc.)
This chapter describes how to navigate
through the menus and on what to pay attention
to perform a good initial startup.
The structure of the following sections is
such that an operator can perform the proce-
dures one-by-one after first time installation and
at the end the instrument is working properly
with basic settings.
It is assumed that the operator is familiar how
to navigate through menus and how to activate
procedures, as described in chapter 5.
Furthermore the instrument should be installed
according the instructions given in chapter 4.
6-1 Abstract