EasyManua.ls Logo

Fujitsu M10-4 - Page 143

Fujitsu M10-4
342 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table
7-10
怀怀
Inactive/cold
replacement
work
procedure
(building
block
configuration
only)
(continued)
Item
Work
procedure Reference
14 Closing
the
rack
door
*1
Simultaneous
replacement
of
the
CPU
memory
unit
and
PSU
backplane
unit
is
prohibited.
To
replace
the
CPU
memory
unit
and
PSU
backplane
unit,
first
replace
either
of
the
units
and
perform
the
work
up
to
"9.
Incorporating
the
chassis
requiring
maintenance
into
the
system."
Then,
return
to
"5.
Releasing
the
chassis
requiring
maintenance
from
the
system,"
and
replace
the
other
unit.
*2
If
a
CPU
memory
unit
lower
is
replaced
in
the
system
of
the
hardware
RAID
volume
in
a
hardware
RAID
configuration
using
internal
disks,
you
need
to
reactivate
the
hardware
RAID
volume
before
starting
Oracle
Solaris.
Start
Oracle
Solaris
on
the
control
domain
as
described
in
"13.
Powering
on
the
chassis
requiring
maintenance."
For
details,
see
"14.2.11
Re-enabling
a
hardware
RAID
volume"
in
the
Fujitsu
M10/SPARC
M10
Systems
System
Operation
and
Administration
Guide.
*3
The
testsb
command
is
executed
during
replacefru
command
processing.
However,
if
that
is
canceled,
diagnose
the
system
board
before
incorporating
the
chassis
requiring
maintenance
into
the
physical
partition.
Chapter
7
怀
Maintenance
Flow 129

Table of Contents

Related product manuals