EasyManua.ls Logo

Holder C270 - Maintenance schedule; Maintenance during the first few operating hours or at vehicle hand-over Part 1

Default Icon
273 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance schedule C250 ... C370
Translation of Original Operating Manual 156319-04 259
Maintenance schedule
The maintenance work described below is to be performed after reaching the indicated number of operat-
ing hours. For each time interval, the maintenance work for the shorter intervals must also be performed.
Example: at 1000 h the maintenance work for every "500 h" must also be performed.
Maintenance during the first few operating hours or at vehicle hand-over Part 1
Due Maintenance work
Maintenance
after the first
few operat-
ing hours or at
vehicle hand-
over
•
Check engine for leaks
•
Check engine oil level, top up if necessary
•
Check air filter system and clean or replace filter cartridge if necessary
•
Check V-belts for tension and condition, adjust tension if necessary
•
Check coolant level and antifreeze, top up if necessary
•
Check fuel lines for condition and leaks
•
Empty water separator (in diesel fuel line)
•
Check air guidance pipes and hoses for leaks
•
Check electrics (function test) and lighting
•
Visual inspection of cable connections and electrical lines
•
Check hydraulic oil level, top up if necessary
•
Check hydraulic lines and hoses for damage and leaks
•
Check steering and cylinder for leaks and function
•
Check radiator and oil cooler for air passage and function

Table of Contents