EasyManua.ls Logo

Inficon HAPSITE ER - Bakeout Procedure

Inficon HAPSITE ER
432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 - 12
HAPSITE ER Operating Manual
6 When the Attach has successfully completed, the Service Module Attached
message will be displayed. (See Figure 12-13.)
Figure 12-13 Service Model Attached
NOTE: Both ATTACH SM and DETACH SM buttons will be grayed out
immediately after a successful attach while the system prepares.
12.6 Bakeout Procedure
A bakeout can be performed with or without the use of the Service Module. A
bakeout heats the NEG pump to 700°C
for a specified length of time. (The default
time setting is two hours). Contact INFICON technical support before performing
this procedure.
1 Click on the Service Module tab of the Properties menu.
2 Click on the Service button. (See Figure 12-14.)
Figure 12-14 Service Button on the Service Module tab

Table of Contents

Related product manuals