12 - 9
HAPSITE ER Operating Manual
8 Are you sure you want to attach the service module? confirmation
message is displayed. Click Yes. (See Figure 12-5.)
Figure 12-5 Confirmation message
9 The Roughing Pump will start first, then the Turbo Pump will begin, as shown
on the Turbo Speed (Hz) line in Figure 12-4 above. The speed is initially
displayed as 0, then increases.
NOTE: After clicking Attach, the HAPSITE Properties window can be closed.
The procedure typically takes about five minutes to complete. While attaching,
the Attaching Service Module Please Wait message is displayed. (See
Figure 12-6.)
Figure 12-6 Attach In Process
10 When the procedure is finished, the HAPSITE is Attached message
is displayed. (See Figure 12-7.)
Figure 12-7 HAPSITE is Attached
12.5.2 Attaching HAPSITE to the Service Module Using the
HAPSITE Front Panel Controls
1 To avoid running the start up method or AutoTune, tap STOP PREPARE. (See
Figure 12-8.)