1 - 10
PN 074-550-P1D
SQC-310 Operating Manual
1.5 Unpacking and Inspection
1 If SQC-310 has not been removed from its packaging, do so now.
NOTE: Do not discard the packing materials until an inventory has been taken
and the installation has been performed successfully. To install
SQC-310 see Chapter 2, Installation for details.
2 Take an inventory of your order by referring to the order invoice and the
information contained in section 1.6.
3 Carefully examine the contents for damage that may have occurred during
shipping. This is especially important if obvious rough handling is noticed on the
outside of the container. Immediately report any damage to the carrier and to
INFICON. To report damage or receive technical assistance, refer to section
1.3, How to Contact INFICON, on page 1-5.
1.6 Configurations and Accessories
1.6.1 SQC-310 Configuration
Figure 1-2 SQC-310 and SQC-310C configuration guide