1.7 Initial Power-On Verification
A preliminary functional check of SQC-310 can be made before formal installation.
It is not necessary to have sensors, source controls, inputs, or relays connected to
do this. For more complete installation information, see Chapter 2, Installation.
1 Confirm that the proper AC line mains voltage is supplied to SQC-310.
2 Confirm that the rear panel (main) AC switch is in the ON Position.
3 After the initial boot-up screen, SQC-310 will display a screen similar to the
screen displayed in Figure 1-3.
Figure 1-3 Main screen