MANUAL OBJECTIVES AND STRUCTURE
(3)
MANUAL OBJECTIVES AND STRUCTURE
This manual is designed to provide users with information on operation, maintenance and inspection
procedures of the Ishida checkweigher.
The following information is contained in this manual.
1. Safety Considerations
Be sure to read and understand all information related to safety contained in this manual before
attempting to operate, inspect or service this equipment.
This information is designed to instruct persons who own, install, operate, service or inspect this
equipment on the warning symbols, precautions which must be observed, and the meanings of
warning etc. labels attached to the machine.
2. Introduction
Describes special terminology, installation specifications, configuration and an operation outline.
3. Installation
This chapter provides information on the correct methods of installing the weigher.
4. Remote Control Unit
Describes the components and functions of the operation panel unit (RCU).
5. Normal Operations and Functions
Provides the procedures for entering machine settings and operating the unit.
6. Production
This chapter provides an outline of operations, emergency stop procedures, pre-operation
preparation and the end production sequence.
7. Cleanup Procedures
Describes machine cleaning procedures for each unit.
8. Additional Functions
Describes the Installation Engineer level procedures not normally used during daily production.