6 PRODUCTION DACS-W Operation Manual
6-2
6.2 Emergency Stop & Restart
Emergency Stop and restart procedures are described below.
Do not power off the checkweigher during production except when emergency
stop is required.
<Emergency Stop>
<Restart>
1. Clear the cause of the emergency stop.
2. Perform the production sequence as usual.
[See 6.4]
1. Turn off the main power switch .
The weigher will stop production.
The operation panel display will go blank.
Figure 6-1 Main Power Switch
MAIN POWER
SWITCH