EasyManua.ls Logo

Lifan 620 - Page 152

Lifan 620
364 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
brake cable to the soleplate by bolts. Tightening torque: 7.8N·m.
3) Smear the heat-resistant grease.
4) Install the brake shoe.
5) Install the pull-back spring of brake shoe.
6) Install the self-adjusting rod of LR brake.
7) Install the front brake shoe.
8) Inspect the installation of brake disc.
9) Install the accessories of brake disc.
10) Adjust the brake shoe clearance.
11) Install the rear wheel. Tightening torque: 103N·m.
12) Temporarily tighten the adjustment nut lead.
13) Install the No. 2 front floor heat-insulating pad. Tighten the No. 2 front floor heat-insulating pad
by 2 bolts. Tightening torque: 5.5N·m.
14) Install the components of the front exhaust pipe.
15) Install the front floor rod by 2 bolts.
16) Check the parking brake rod play.
17) Adjust the parking brake rod play.
18) Check if there is air leakage.
19) Install the accessories of auxiliary fascia console sundries box.
20) Install floor shift lever components.
21) Install the auxiliary fascia console.
22) Install the accessories of the auxiliary fascia console.
151
www.cargeek.ir
www.CarGeek.ir
www.cargeek.ir

Table of Contents

Related product manuals